An SPV privately owned 100% by Greentop Energy System S.A., founded in Athens, on 31/07/2018. The SPV’s sole purpose is to develop, construct and operate a wind project in Peloponnese, South Greece, with a total capacity of 36MW.
Projects
Project Description
The SPV plans to develop a project in Peloponnese, Prefecture of Arkadia, Municipality of Falanthos, at locations called ‘Prophet. Elias’, ‘Madara’, and ‘Vourtsa’. The wind park is sited at a height of 1,500 m, on a mountain ridge close to the Mainalon mountain. The prevailing wind is WSW/ ESE. The wind potential has been measured by a 10m & a 40m mast.
The SPV has been granted with a Generation (Production) License. The Project has also applied for Preliminary Grid Connection Terms to the Hellenic Transmission System Operator (HTSO/ ADMHE) even though the grid of Peloponnese is characterized as saturated. Furthermore, an Environmental Impact Assessment has been filled and submitted to the relevant authorities.