An SPV privately owned 100% by Greentop Energy System S.A., founded in Athens, on 31/07/2018. The SPV’s sole purpose is to develop, construct and operate a wind project in Peloponnese, South Greece, with a total capacity of 36MW.
Projects
Project Description
The SPV is developing a 36 MW wind project in the Regional Unit of Arcadia, Peloponnese, near Mount Mainalo, at the locations of Profitis Ilias, Madara and Vourtsa, in the area of Falanthos.
The wind farm is planned , along a mountain ridge. The prevailing wind directions are WSW and ESE, and wind potential has been assessed using 10 m and 40 m meteorological masts.
The project has been reclassified as a Special Project under Article 11B, following the incorporation of a Battery Energy Storage System (BESS) into the wind farm development. The environmental permitting procedure remains in progress.